Home

Facility Addition for US Air Force

IDEALS, Inc. was enlisted by the US Air Force to provide design-build services for a new addition at the Holloman Air Force Base in Alamogordo, New Mexico.
Learn More 

 

Military Housing Renovation

IDEALS, inc. completed this $2.8M renovation at Yuma Proving Grounds for the U.S. Army by upgrading existing living spaces and installing extensive energy conservation measures.
Learn More

 

Prather Waterline | HAFB

This utility infrastructure construction project involved the replacement of approximately 21,000 linear feet (LF) of existing 16” diameter concrete cylinder with a new 16” C905 PVC pipe.
Learn More

 
  • Register

This project involved the addition of a pre-engineered building to the sheet metal shop, building 883, located at Holloman Air Force Base.  This design-build project added a new clean layout/cure room, break room, restrooms, office space to accommodate workstation personnel, a convenient covered building entry and reconfigured sidewalk access comprising approximately 2000 gross square feet.  The construction of Building 883 increased and reconfigured the existing work area into a useful and more productive space, already serving as a structural repair shop for the Unmanned Aerial System, (UAS) program at Holloman Air Force Base.

One of the requirements of this building addition was to accommodate aircraft structures up to 2'-0" wide and a maximum of 33'-0" long and moving them in straight lines from one part of the existing building to the new layout/cure room, via a rolling trailer.  This eliminated moving the large structures around turns, which requires more space, and as a result, reduced the necessary space for the final building design.  Also, the Layout/Cure room required sufficient seals to maintain specified HVAC performance with humidity and temperature controls to maintain a low level of particulate infiltration throughout the entire Layout/Cure room.

To ensure proper site drainage, a site survey was completed in consideration of existing site conditions and drainage around the building addition consistent with base standards.  Preserving the surrounding terrain and providing drainage away from the building addition was a design priority.

One of the goals of this project was to provide a convenient and work efficient design that met the clients needs and is safety compliant.  We were able to deliver an effective design using these design requirements through coordination with the design and project reviewers.  Another project requirement was to work within a predetermined budget and that all work was finished on schedule.  This project required a set of civil, structural, mechanical and electrical construction plans and project specifications for all items of work in addition to direct coordination with the construction company to ensure a complete and successful completion of the project.

What Our Customers Say About Our Work

I have enjoyed a great working relation with Mrs. Dubbin over the past five years on several government projects. We attribute our success on those projects largely to our ability to work together as a team and remaining focused on critical tasks. She also holds a high regard for customer satisfaction as do we, and customer satisfaction is essential for repeat business. We work well together because we share the same core values and that is a quality that creates a great working relation with all parties concerned.
Ricardo Araiza, President
R-Con Construction
 
I have worked with Ideals Inc. on numerous WSMR contracts ranging from construction of Sewage Lagoons to Tank Trails repair. The professionalism and expertise of Ideals was instrumental in accomplishing these projects on time and to our wants and needs. Above all else Ideals Inc’s focus is the customer which made it a real pleasure to work with them.
Orlando Hernandez, Contract Specialist
Mission and Installation Contracting Command - White Sands Missle Range
 

Get To Know Our Staff

IDEALS multidisciplinary dedicated team of experienced professional engineers, scientists, project managers, and construction professionals have been carrying clients’ projects from concept to completion since 2005.

 

Margaret L. Dubbin, PE
President
Your Name
Employment Opportunities