Projects

Facility Addition for US Air Force

IDEALS, Inc. was enlisted by the US Air Force to provide design-build services for a new addition at the Holloman Air Force Base in Alamogordo, New Mexico.
Learn More 

 

Military Housing Renovation

IDEALS, inc. completed this $2.8M renovation at Yuma Proving Grounds for the U.S. Army by upgrading existing living spaces and installing extensive energy conservation measures.
Learn More

 

Prather Waterline | HAFB

This utility infrastructure construction project involved the replacement of approximately 21,000 linear feet (LF) of existing 16” diameter concrete cylinder with a new 16” C905 PVC pipe.
Learn More

 
  • Register

West New Mexico Avenue is an busy roadway through Holloman Air Force Base (HAFB), providing access to the officer's club, the PX and other important base services. Repair and restoration of the existing roadways in and around HAFB is an ongoing process and requires consistent design and construction practices.

This project involved the repair of West New Mexico Avenue beginning from 11th Street to 1st Street, comprising a total length of approximately 4000 linear feet, varying between 30 and 36 wide. A traffic control plan was developed in order to anticipate and manage the everyday traffic flow during the construction of the roadway.

This project also required the repair of existing curb, gutter and some sidewalk areas. Some of the existing concrete structures along West New Mexico Avenue had been damaged over time and it was necessary to restore them to maintain pedestrian safety and control water flow on the roadway surface.

IDEALS designed and constructed a new roundabout at the 6th Street intersection to improve traffic flow and reduce congestion. The roundabout is the first of it's kind at HAFB and offers modernized traffic calming and more efficient traffic flow.